TRMI Battle Creek

Kalamazoo Mechanical, Inc. performed the complete HVAC and Plumbing on the 80,000SF TRMI expansion in Battle Creek MI. The buildings’ heating and cooling needs are served by (8) packaged heating and cooling RTUs. The dock doors were served by the air curtains to temper the air infiltration from constantly open dock doors. KMI partnered with Control Solutions Inc to perform the web based temperature controls work which was tied into the facilities existing system.

Posted in HVACR Projects, Industrial and Manufacturing, Warehouse